Build faster, build smarter
WhatsAppGet a QuoteCompare SystemsFind Us

Stork Megaspan

Build smarter. Build stronger. Build faster. Pre engineered steel buildings for structures that need wide clear spans, strength and open floor area.

Clear span steel hangar at PAF NASTP Alpha 8
Stork Megaspan

Transforming steel into high performance structures

Stork Megaspan is our complete pre engineered steel building system, engineered for efficiency, durability and versatility. Every component is designed and manufactured with precision for faster installation, reduced maintenance and exceptional structural reliability.

Every structure is designed to meet modern construction standards while reducing project timelines and lifecycle costs. We run the whole job in house: site survey, design, fabrication, delivery, erection, civil works and finishing.

  • Tapered built up primary frames
  • Cold formed Z and C secondary members
  • Single skin, insulated or sandwich panel envelope
  • Designed to MBMA, AISC and IBC
Our applications

What we build with Megaspan

Industrial buildings

Purpose built facilities for manufacturing plants, production units and industrial operations.

Warehouses and logistics

Large span storage buildings designed for efficient inventory management and logistics.

Commercial buildings

Retail outlets, office complexes, shopping centres and commercial developments.

Agricultural buildings

Steel structures for farms, processing facilities, livestock shelters and storage.

Sports and recreation

Indoor sports halls, gymnasiums and recreational facilities with column free space.

Institutional buildings

Educational campuses, healthcare facilities, exhibition halls and public infrastructure.

Hangars

Clear span halls where the width of the opening is the point of the building.

Cold stores

Insulated envelopes specified for continuous low temperature operation.

Customised steel structures

Structures designed around a specific requirement, across multiple sectors.

On a Stork site

Clear span, nothing in the way

That is the whole point of a portal frame. The floor stays open, so racking, cranes and vehicle routes are planned around the work rather than around the structure.

See our projects
Capability

Design envelope

The limits we are asked about most. Every building is still designed to its own loads, site and use.

ParameterStork Megaspan PEB
Clear spanUp to 80 to 100 m, depending on the requirement
Bay spacing4 to 10 m
Eave heightUp to 30 to 35 m
Crane capacityFully customisable, to 50 tonnes and above
Design codesMBMA, AISC, IBC
Fabrication capacity1,000 tonnes and more, with over 50,000 sq ft delivered in a single month
Lead time15 to 30 days from order to delivery; delivery to handover depends on project size
ScopeSite survey, design, fabrication, delivery, erection, civil works and finishing
Reference project

PAF Nur Khan Airbase, NASTP

A PEB hall built alongside a hybrid light gauge steel office building.

50,000 sq ft
Hall floor area
100 m
Hall length
50 ft
Hall height
20 t
Crane loading capacity
Our projects

Megaspan on site

Pakistan Air Force projects at Nur Khan, NASTP Alpha 8 and Kamra, from steel frame to finished building.

Common questions

What clients ask about PEB

A pre engineered building is a steel structure designed and manufactured using engineered components, then assembled on site. It is an efficient solution for large buildings that need strength, durability and open floor space.

We design and build industrial buildings, warehouses, commercial buildings, agricultural buildings, sports halls, institutional buildings, hangars, cold stores and customised steel structures.

PEB systems accommodate large clear spans, up to 80 to 100 m depending on the requirement, which suits open industrial and commercial space. The achievable span depends on the building dimensions, loads, wind conditions and structural design.

Cost depends on the building size, steel tonnage, height, span, roofing and cladding, insulation, doors, foundations and finishing. Use our budget calculator for an indicative range, and we provide a project specific quotation after reviewing your requirements.

PEB is generally faster than conventional on site steel construction because the components are manufactured in advance. Order to delivery typically takes 15 to 30 days depending on area; the full programme depends on design approvals, foundations, transport and site erection.

Yes. Stork provides in house design and engineering, manufacturing, installation and finishing through our integrated project teams.

Have a building in mind?

Send us the purpose, location, span and height. Our sales team will come back with a budget and a programme.